Tolleen se menis valmistajan ohjeen mukaan:

ADJUSTMENT OF CABLES

Steel cables will stretch depending on the operational load and therefore require adjustment as follows:

a. Load the lift with approximately 2500 kg (5500 lbs). b. Switch off air supply. Adjust wires to make the 4 ratchets engage simultineously when UP-button is activated. c. Raise lift to top position. Check distance from underside of ratchet to underside of hole in ratchet rail; this distance must be min. 20 mm. d. Lower the lift to bottom position and check that the platforms rest against their stops. If not, adjustment of cables or ratchet rails is necessary.